Karongi Project
Construction of Byogo and Ruhanga Pumping Water Supply System
Information
- Client: Karongi District
- Location: Karongi District
- Date: 2022-2023
- Category: Water Supply
- Time: 8 Month
Qualifications Of Key Staff of the Project:
- Civil Engineers (2)
- Electro-Mechanical Engineer (1)
- Hydraulic Engineers (2)
- Plumbers (16)
- Land Surveyor (1)
- Quantity Surveyors (8)
Construction Technicians (18)
Description of the Assignment performed by our staff:
- Source capture and development
- Supply, delivery, and installation of electric water pumps with soft-starter control panels
- Installation of approximately 25 km of water transmission pipeline,
- Construction of reinforced concrete storage reservoirs
- Development of break-pressure chambers and valve chambers
- Construction of community water points
Installation of all hydraulic fittings and accessories.
- End-to-end pumping water supply system construction
- Integration of civil, hydraulic, and electro-mechanical engineering works
- Delivery of large-scale pipeline infrastructure
- Provision of sustainable community water access within planned schedule and budget.
Related Projects
Ndengo Project
System by using solar powered submersible pump sets-1 tons and kept 1 pump as a standby.
Nyagatare Projects
System by using solar powered submersible pupmp sets-1 ons and kept 1 pump as a standby. It is proposed to provideHDPE piipes 90mm PN 10 as main pipe to supply water to submains of reservoir and HDPE pipes 90,63,50mm PN 10 for lateral lines
Multi-Site Industrial Water Infrastructure Contracts
Supply and Rehabilitation of Water Catchment Areas in Different Rwanda Mountain Tea (RMT) Regions
KAZEN/WASAC/JICA COOPERATION
Procurement and execution of works for rehabilitation of pipeline for the project for WASAC Utility turnaround with KAIZEN Approach