Ndego Project

The Ndego Project was completed using a solar-powered submersible pump system with one active and one standby pump. The installation features HDPE pipes — 90mm PN10 as the main line and 90mm, 63mm, and 50mm PN10 for the lateral network — ensuring efficient and reliable water distribution.

Irrigation Project at Kayonza District

Information

  • Client: Kayonza District
  • Location: Byimana, Ndego
  • Date: 2019
  • Catetory: Irrigation
  • Time: 1 Month

System by using solar powered submersible pump sets-1 on and kept 1 pump as a standby. It is proposed to provide HDPE pipes 90mm PN 10 as main pipe to supply water to submains of reservoir and HDPE pipes 90,63,50mm PN 10 for lateral lines.
Since the solar rediation is available for 6 hours so irrigation system has been designed to irrigate the crops in 6 hours in alternate day.

Entire operation of sprinklers & surface system is dependent on intensity of solar radiation available in the field, Incase of less intensity of solar radiation, irrigation has to be given for next day.

Paramaters

Area under: Installed the hydrants & surface irrigation 20ha, Crops: Maize, beans and bananas, Water resource: Lake Available irrigation: 6 hours max per day, Water application: Sprinkler and surface system, Sprinkler model: Model – gravity system into the hydrants, surface irrigation with hose pipes and sprinkler nozzle on a head of pipes is reconnected, Pump Discharge: 150m 3 per day, Distance: Between hydrants 50m, Operating pressure: 22m (2.5kg/cm2), Sprinkler spacing & pattern: 22m x 22m, square shape, Precipitation rate: 5.28 mm per hour

Number of sprinklers and hydrants in 20ha plot

32 Sprinkler in working conditions and 32 sprinkler in advance mode and 35 hydrants

Sprinkler lateral pipeshift able / portable/movable and fixed pipes

QC(Quick coupling) HDPE pies 63 mm PN6.3 one end male and other, end female with metal latch type clamp for hand moved system (the old system) For new system, 90PN10, 371Lmeters of many line pipes its fixedsystemand 90PN 10, 1520m for lateralof sub many line; Water application pipes of 50mm PN 10 is 2429m

Sprinkler submain (buried)

HDPE pipes of 90 mm PN 10 buried underground and 10 Sprinkler ydrants are taken off ar every 24m distance on each submain.

Sprinkler hydrant

G.I valve 2″, HDPE tee 2 inch, G.I 2inch pipes – G.I 2inch elbow are taken off every22m distance at each water application (HDPE pipes 50mm PN10)- Hydraulic valve with pressure pilot at each submains Hydraulic valves(3″) with pressure pilot are provided at each submain for on off purpose and pressure regulation purposeas per the requirement.

Butterfly valve 3″ – Flush valve

Butterfly valves 3″ are provided at each submain end to flush out the submain

Butterfly valve 3″ – Flush valve

Air release valves at submain

Pvc air release valves 2″ are provided on HDPE mainline of 110mm

HDPE main lines

HDPE pipeline of 110mm ON 10 is provided as a feeding main to all sprinkler submains(old system), HDPE pies of 90mm PN 10 is submain pipes fedding lateral pipes of 50mm PN10(new system)

Sprinkler hydrant

G.I valve 2″, HDPE tee 2 inch, G.I 2inch pipes – G.I 2inch elbow are taken off every22m distance at each water application (HDPE pipes 50mm PN10)- Hydraulic valve with pressure pilot at each submains Hydraulic valves(3″) with pressure pilot are provided at each submain for on off purpose and pressure regulation purposeas per the requirement.

Butterfly valve 3″ – Flush valve

Butterfly valves 3″ are provided at each submain end to flush out the submain

Butterfly valve 3″ – Flush valve

Air release valves at submain

Pvc air release valves 2″ are provided on HDPE mainline of 110mm

HDPE main lines

HDPE pipeline of 110mm ON 10 is provided as a feeding main to all sprinkler submains(old system), HDPE pies of 90mm PN 10 is submain pipes fedding lateral pipes of 50mm PN10(new system)

Non return valve

C.I Non return valve 4″ provided on mainline to prevent water hammer and black pressure (old system and new system)

Auto Quick Pressure Relief valve

Auto Quick Pressure Relief valve 2″ is provided after the pump unit to release the sudden built of pressure in the systemso that to prevent the pipeline from breaking (old system); Check valve HDPE type 3″ is installed on delivery pipe and connected to the new systemold system. 35 pcs of check valves HDPE type 2″ is fixed on lateral line are provided feeding to all hydrants.

Manual Bypass cum Pressure relief valve

Manual By-pass cum pressure relief valce 3″ is provided on two distributors line after the pump uni to release the sudden built of pressure in the system so that to prevent the pipe line fro breaking.Filtration unit A screen filtration unit (casing pipe) Dia of 200 mmfilter the water from physical inpurities like silt, clay, sand, solid particles, etc.

Related Projects

KAZEN/WASAC/JICA Cooperation

Procurement and execution of works for rehabilitation of pipeline for the project for WASAC Utility turnaround with KAIZEN Approach

Nyagatare Projects

System by using solar powered submersible pupmp sets-1 ons and kept 1 pump as a standby. It is proposed to provideHDPE piipes 90mm PN 10 as main pipe to supply water to submains of reservoir and HDPE pipes 90,63,50mm PN 10 for lateral lines

Karongi Project

Supply and Rehabilitation of Water Catchment Areas in Different Rwanda Mountain Tea (RMT) Regions

Multi-Site Industrial Water Infrastructure Contracts​

Supply and Rehabilitation of Water Catchment Areas in Different Rwanda Mountain Tea (RMT) Regions

Got Questions?

Contact us today to schedule a consultation or to learn more about our services.

Scroll to Top